DPBC CONSTRUCTION LLC

The full scope of formwork and concrete work

DPBC CONSTRUCTION LLC forms, pours and finishes foundations, walls and flatwork for Utah Valley builders from its Springville formwork yard at 663 N 100 E, Springville - 84663-5698, United States (US). The six services below describe exactly what our crews build, how the work is sequenced, and what a finished placement should look like when the forms come off.

Six services, one pour shed

Foundation Forming and Pours

Footings and stem walls are the first place a building either lands true or fights the crew for the rest of the job. We excavate to the drawing, stake the footing lines, then build the footing forms with clean ply and solid bracing. Reinforcing steel is placed to the engineer schedule and held at the correct cover before inspection. Once the footing is approved we pour, screed and float the top, then set the stem wall forms on top and repeat the cycle for the wall pour. Panels and walers come from our Springville yard, stripped, cleaned and oiled between every use so the concrete face releases without tearing. Anchor bolts, hold downs and embeds are set from a template so the framing crew finds them exactly where the plan shows.

Structural Wall Panels

Structural walls, whether tilt up or cast in place, are built flat and true on a prepared casting bed. We set the panel edges, align the joints and run tie rods on a regular grid so the form face stays straight under the weight of wet concrete. Lift inserts, coil inserts and edge chamfers are placed before the pour, and every embed is checked against the rigging plan so the crane pick is predictable. Form faces are oiled evenly and the mix is placed in lifts with proper consolidation, which drives out the bug holes and honeycomb that show up when a wall is poured too fast. When the panels are cured we strip, patch the tie holes and finish the faces to the specified texture before they are lifted into position.

Flatwork and Driveways

Driveways, patios, shop floors, walkways and equipment pads are graded for drainage first, because a slab that pools water is a slab that fails early. We set the subgrade, place and compact base, then form to grade with the slope the site needs. Joint layout is planned before the pour so control joints fall in the right places and cut cleanly. The mix is placed, screed, floated and finished to the requested texture, and the surface is checked with a straightedge before it sets. We cut control joints on the required spacing, cure the slab, and leave the work with an edge that reads crisp instead of ragged.

Curb and Sidewalk Machines

Continuous curb, gutter and small sidewalk runs are extruded with our curb machine in a single pass, which holds a straight line far better than a long set of hand forms. We set the string line first, checking grade and alignment, then run the machine with the correct mold for the curb profile and the required cross section. The extruded face is finished by hand immediately behind the machine, then control joints are cut on the specified spacing. Because the run is poured continuously, the joints are consistent and the curb face stays uniform across the whole length. Where a sidewalk run ties into a driveway or a radius, we finish the transition so the walk meets the apron cleanly.

Grade and Layout Staking

Every placement begins with the elevation work. We bring the laser level, the tripod and the stake bundle to the site, shoot the grades from a known benchmark and set the hubs and offsets that carry the building corners through the whole job. Cut sheets and fill marks are written on the stakes so the excavator, the footing crew and the form crew all read the same numbers. Chalk lines snap the wall faces and the control lines, and we re-check the layout after the footing pour to confirm the stem walls are still square. Good staking is quiet work that saves loud arguments later, and it is the service that makes every other service possible.

Concrete Repair and Patching

Concrete takes damage: spalled edges at a driveway apron, a cracked shop floor, a failed joint in a walkway, hairline cracks that open with freeze and thaw. We cut the damaged area back to sound concrete, clean it, and patch with a mix matched to the surrounding work so the repair blends rather than shouts. Larger failures are replaced, not covered, which means removing the isolated section, re-forming it and pouring new concrete tied into the existing slab. We also repair wall surfaces, rub out form marks and fill tie holes so a repaired face matches the rest of the structure. The goal is a surface that holds up to the next decade, not a cosmetic patch that fails in the next season.

DPBC CONSTRUCTION LLC opens its winter pour schedule now, holding formwork crews and pump dates through the cold months for builders across Utah Valley.

How a placement moves

01

Walk the site

We read the plans, check access and confirm the pour size, the pump reach and the crew window.

02

Grade and form

We shoot grades, set stakes, build and brace the forms, tie the steel and call for inspection.

03

Pour and finish

The mix is placed in controlled lifts, consolidated, finished and protected while it cures.

04

Strip and close out

Forms come off, tie holes are patched, the work is cleaned and the yard gear returns to the rack.

Tell us about your foundation, wall or flatwork project